BARIŞ TECHNOLOGİCAL INSTALLATİON
Indirect steam generators can be used instead of a steam boiler in plants where a sufficient heating system exists. Less space requirement due to packaged construction, Low-pressure fluctuations due to large steam and water volume
MAZLUM STEEL PIPES
The rock shoe prevents damage to the pile during pile driving in rocky ground.
Outside Diameter : 711,2mm
Wall Thickness : 14,2 mm
Per Pile Length : 25 Meters
BARIŞ TECHNOLOGİCAL INSTALLATİON
ECONOMIZERS AND AIR PREHEATERS
Engineering according to fuel and application specifications, Perfect design for optimal heat transfer and water/flue gas pressure drop, Delivery with all auxiliary equipments (Optional)
ÖNER SEPARATOR
MODERN WITH TECHNOLOGY EQUIPPED OLIVE OIL MANAGEMENT
MODERN WITH TECHNOLOGY EQUIPPED OLIVE OIL MANAGEMENT
BARIŞ TECHNOLOGİCAL INSTALLATİON
Waste heat boilers for hot water, Steam, Superheated steam, Thermal oil, and hot air production, Smoketube and watertube constructions, Custom designed solutions according to waste heat and site conditions
BARIŞ TECHNOLOGİCAL INSTALLATİON
Length is possible up to 12 mt (40 ‘). Easy transportation is available because of the compact frame. Sound insulation is possible at the desired level.Thermal insulation is possible at the desired level
ÖNER SEPARATOR
TECNOLOGICAL ONE TOUCH A DESING SOLUTION
TECNOLOGICAL ONE TOUCH A DESING SOLUTION
MAZLUM STEEL PIPES
QUALITY CONTROL
XRAY and RT Test Line
Hydrostatic Tests
MAZLUM STEEL PIPES
Internal Sa2 ½ sandblasting. Sandblasting is very neccessary for surface preparation for steel pipes. All surfaces must be thoroughly clean, dry, sound and free from grease, oils, waxes and all loose materials.