
MAZLUM STEEL PIPES
Tubular Piles with Clutch Welding.
Materials : E22 Clutch
Material Steel Grade : API 5L X60 PSL1
Manufacturing Standards : ASTM A252
BARIŞ TECHNOLOGİCAL INSTALLATİON

Deaeration is the process of removing the dissolved oxygen from the boiler feedwater. Additionally, in the deaeration process, the CO2 is also removed. Removal of these two gases is important in
BARIŞ TECHNOLOGİCAL INSTALLATİON

Solid / liquid / gas and biogas fuel options, High efficiency, low thermal losses, Perfect design for optimal heat transfer and oil/flue gas pressure drop
BARIŞ TECHNOLOGİCAL INSTALLATİON

ECONOMIZERS AND AIR PREHEATERS
Engineering according to fuel and application specifications, Perfect design for optimal heat transfer and water/flue gas pressure drop, Delivery with all auxiliary equipments (Optional)
MAZLUM STEEL PIPES

Internal Sa2 ½ sandblasting. Sandblasting is very neccessary for surface preparation for steel pipes. All surfaces must be thoroughly clean, dry, sound and free from grease, oils, waxes and all loose materials.
BARIŞ TECHNOLOGİCAL INSTALLATİON

Length is possible up to 12 mt (40 ‘). Easy transportation is available because of the compact frame. Sound insulation is possible at the desired level.Thermal insulation is possible at the desired level
BARIŞ TECHNOLOGİCAL INSTALLATİON
SMOKE TUBE AND WATER TUBE STEAM GENERATORS
Ideal solution for plants that need low capacity and quick steam production. Three pass, high efficient steam generators up to 5 t/h steam capacity. Smoke tube and water tube constructions
BARIŞ TECHNOLOGİCAL INSTALLATİON

Small-sized, small-capacity ENERKON Electrical Steam Generators are perfect for industries that require quick, efficient, and high-quality steam in laboratories, hospitals..
MAZLUM STEEL PIPES

The rock shoe prevents damage to the pile during pile driving in rocky ground.
Outside Diameter : 711,2mm
Wall Thickness : 14,2 mm
Per Pile Length : 25 Meters
MAZLUM STEEL PIPES

QUALITY CONTROL
XRAY and RT Test Line
Hydrostatic Tests