MAZLUM STEEL PIPES
The rock shoe prevents damage to the pile during pile driving in rocky ground.
Outside Diameter : 711,2mm
Wall Thickness : 14,2 mm
Per Pile Length : 25 Meters
ÖNER SEPARATOR
TECNOLOGICAL ONE TOUCH A DESING SOLUTION
TECNOLOGICAL ONE TOUCH A DESING SOLUTION
BARIŞ TECHNOLOGİCAL INSTALLATİON
COGENERATION - TRIGENERATION SYSTEMS
Cogeneration or combined heat and power (CHP) is the simultaneous production of electricity with the recovery and utilization of waste heat. Cogeneration is a highly efficient form of
ÖNER SEPARATOR
PASTEURİZATİON COMPACT SYSTEM 15.000 LT-H
Pasteurization Compact System 15.000 LT-H
MAZLUM STEEL PIPES
Tubular Piles with Clutch Welding.
Materials : E22 Clutch
Material Steel Grade : API 5L X60 PSL1
Manufacturing Standards : ASTM A252
MAZLUM STEEL PIPES
Internal Sa2 ½ sandblasting. Sandblasting is very neccessary for surface preparation for steel pipes. All surfaces must be thoroughly clean, dry, sound and free from grease, oils, waxes and all loose materials.
BARIŞ TECHNOLOGİCAL INSTALLATİON
ECONOMIZERS AND AIR PREHEATERS
Engineering according to fuel and application specifications, Perfect design for optimal heat transfer and water/flue gas pressure drop, Delivery with all auxiliary equipments (Optional)
BARIŞ TECHNOLOGİCAL INSTALLATİON
Deaeration is the process of removing the dissolved oxygen from the boiler feedwater. Additionally, in the deaeration process, the CO2 is also removed. Removal of these two gases is important in
BARIŞ TECHNOLOGİCAL INSTALLATİON
Indirect steam generators can be used instead of a steam boiler in plants where a sufficient heating system exists. Less space requirement due to packaged construction, Low-pressure fluctuations due to large steam and water volume