
BARIŞ TECHNOLOGİCAL INSTALLATİON

Provides efficient and economical solutions for processes that need dry steam, Provides efficient separation with centrifugal effect, Needs no maintenance due to having no moving part
Withstands unfavorable conditions and water hammer
BARIŞ TECHNOLOGİCAL INSTALLATİON
SMOKE TUBE AND WATER TUBE STEAM GENERATORS
Ideal solution for plants that need low capacity and quick steam production. Three pass, high efficient steam generators up to 5 t/h steam capacity. Smoke tube and water tube constructions
BARIŞ TECHNOLOGİCAL INSTALLATİON

ECONOMIZERS AND AIR PREHEATERS
Engineering according to fuel and application specifications, Perfect design for optimal heat transfer and water/flue gas pressure drop, Delivery with all auxiliary equipments (Optional)
BARIŞ TECHNOLOGİCAL INSTALLATİON

Indirect steam generators can be used instead of a steam boiler in plants where a sufficient heating system exists. Less space requirement due to packaged construction, Low-pressure fluctuations due to large steam and water volume
MAZLUM STEEL PIPES

Potable Water Pipes with Epoxy Coating. Outside Diameter : 1016mm / Wall Thickness : 10mm / Pipe Length :13.50 Meters / Steel Grade : S355JR
BARIŞ TECHNOLOGİCAL INSTALLATİON

Direct hot water production from cold water, Design and production for oil and gas fuels, Completely hot galvanized or stainess steel production, Seconder heating system is not necessary (Steam, Hot water)
MAZLUM STEEL PIPES
Tubular Piles with Clutch Welding.
Materials : E22 Clutch
Material Steel Grade : API 5L X60 PSL1
Manufacturing Standards : ASTM A252