
BARIŞ TECHNOLOGİCAL INSTALLATİON
SMOKE TUBE AND WATER TUBE STEAM GENERATORS
Ideal solution for plants that need low capacity and quick steam production. Three pass, high efficient steam generators up to 5 t/h steam capacity. Smoke tube and water tube constructions
MAZLUM STEEL PIPES
Tubular Piles with Clutch Welding.
Materials : E22 Clutch
Material Steel Grade : API 5L X60 PSL1
Manufacturing Standards : ASTM A252
BARIŞ TECHNOLOGİCAL INSTALLATİON

Deaeration is the process of removing the dissolved oxygen from the boiler feedwater. Additionally, in the deaeration process, the CO2 is also removed. Removal of these two gases is important in
MAZLUM STEEL PIPES

Potable Water Pipes with Epoxy Coating. Outside Diameter : 1016mm / Wall Thickness : 10mm / Pipe Length :13.50 Meters / Steel Grade : S355JR
BARIŞ TECHNOLOGİCAL INSTALLATİON

Length is possible up to 12 mt (40 ‘). Easy transportation is available because of the compact frame. Sound insulation is possible at the desired level.Thermal insulation is possible at the desired level
BARIŞ TECHNOLOGİCAL INSTALLATİON

Indirect steam generators can be used instead of a steam boiler in plants where a sufficient heating system exists. Less space requirement due to packaged construction, Low-pressure fluctuations due to large steam and water volume
ÖNER SEPARATOR

PASTEURİZATİON COMPACT SYSTEM 15.000 LT-H
Pasteurization Compact System 15.000 LT-H