ÖNER SEPARATOR
PASTEURİZATİON COMPACT SYSTEM 15.000 LT-H
Pasteurization Compact System 15.000 LT-H
BARIŞ TECHNOLOGİCAL INSTALLATİON
Deaeration is the process of removing the dissolved oxygen from the boiler feedwater. Additionally, in the deaeration process, the CO2 is also removed. Removal of these two gases is important in
MAZLUM STEEL PIPES
The rock shoe prevents damage to the pile during pile driving in rocky ground.
Outside Diameter : 711,2mm
Wall Thickness : 14,2 mm
Per Pile Length : 25 Meters
MAZLUM STEEL PIPES
Tubular Piles with Clutch Welding.
Materials : E22 Clutch
Material Steel Grade : API 5L X60 PSL1
Manufacturing Standards : ASTM A252
BARIŞ TECHNOLOGİCAL INSTALLATİON
Direct hot water production from cold water, Design and production for oil and gas fuels, Completely hot galvanized or stainess steel production, Seconder heating system is not necessary (Steam, Hot water)
BARIŞ TECHNOLOGİCAL INSTALLATİON
COGENERATION - TRIGENERATION SYSTEMS
Cogeneration or combined heat and power (CHP) is the simultaneous production of electricity with the recovery and utilization of waste heat. Cogeneration is a highly efficient form of
BARIŞ TECHNOLOGİCAL INSTALLATİON
Length is possible up to 12 mt (40 ‘). Easy transportation is available because of the compact frame. Sound insulation is possible at the desired level.Thermal insulation is possible at the desired level